Tested & Approved E_S4HCON2023 Study Materials Download Free Updated 81 Questions [Q29-Q50]

Share

Tested & Approved E_S4HCON2023 Study Materials Download Free Updated 81 Questions

Regular Free Updates E_S4HCON2023 Dumps Real Exam Questions Test Engine

NEW QUESTION # 29
You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?

  • A. The start of the Execution roadmap step
  • B. The end of the database migration
  • C. The start of the business downtime
  • D. The end of the business downtime

Answer: D


NEW QUESTION # 30
During the upgrade of your development system, you run into the adjustment of non-dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?

  • A. SUM continues with the next phase and your modifications are lost
  • B. SUM refuses to continue unless you have marked a transport request as modification adjustment transport
  • C. SUM continues with the next phase and your modifications are kept as In the start release
  • D. Before continuing with the next phase SUM asks for a modification adjustment transport

Answer: C


NEW QUESTION # 31
You are running an SAP ECC system.
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?
Note There are 3 correct answers to this question

  • A. Upgrade the SAP system
  • B. Use DMO for SUM
  • C. Apply SAP support packages
  • D. Perform an SAP S/4 HANA conversion including DMO
  • E. Perform an SAP S/4 HANA conversion without DMO

Answer: A,B,C


NEW QUESTION # 32
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:

  • A. SAP S/4HANA conversion to SAP S/4HANA 1709
  • B. Using DMO when applying Support Packages to SAP ECC 6.07
  • C. Upgrading to SAP ECC 6.08 without using DMO
  • D. Updating to SAP ECC 6.07 using DMO

Answer: A,C


NEW QUESTION # 33
You are executing a standard SUM procedure to update an SAP system using main configuration mode
"Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:

  • A. Early in the downtime
  • B. Before the downtime starts
  • C. At the end of the downtime
  • D. As part of the cleanup process

Answer: B


NEW QUESTION # 34
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:

  • A. The SAP Support Packages contained in the upgrade media
  • B. The SAP Support Packages found in the download directory
  • C. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
  • D. The SAP Support Packages that will be bound to the upgrade

Answer: B


NEW QUESTION # 35
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.

  • A. Release upgrade
  • B. Dual Stack split
  • C. Database migration
  • D. Homogenous system copy
  • E. Support Package Stack update

Answer: A,C,E


NEW QUESTION # 36
You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.

  • A. Software update
  • B. Main import
  • C. Migration
  • D. Conversion

Answer: C,D


NEW QUESTION # 37
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?

  • A. AA
  • B. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.

Answer: B


NEW QUESTION # 38
During the configuration of the DMO for SUM, which Migration Parameter selection is NOT possible for an inplace migration?

  • A. Table contents compare
  • B. Table count verification
  • C. Migration repetition option
  • D. DMO with system move

Answer: D


NEW QUESTION # 39
What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM?

  • A. The benchmaking option allows you to migration a specified set of tables
  • B. The benchmaking option allows you to repeat the uptime migration
  • C. The repetition option allows you to run the migration without a shadow system
  • D. The repetition option allows you to repeat the complete migration

Answer: A


NEW QUESTION # 40
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:

  • A. Using the main configuration option "Single System" in case of an upgrade.
  • B. Using the main configuration option "Standard" when applying SAP Support Packages
  • C. Using the database migration option (DMO) for SUM
  • D. Using the main configuration option "Single System" when installing an Add-On

Answer: D


NEW QUESTION # 41
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:

  • A. SAT (Runtime Analysis)
  • B. SE80 (Object Navigator)
  • C. ATC (ABAP Test Cockpit)
  • D. SYCM (Simplification Database Content)

Answer: B,C


NEW QUESTION # 42
You are planning an SAP S/4HANA conversion.
Which conversion-specific tasks must be performed during the preparation phase?

  • A. Perform the migration of data to the new data structure.
  • B. Check the compatibility of custom code with SAP S/4HANA.
  • C. Solve problems from the simplification item (SI) checks.
  • D. Run the database migration to the SAP HANA database.

Answer: B


NEW QUESTION # 43
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
There are 2 correct answers to this question.
Response:

  • A. Check the most recent entries shown in file sapevt.trc
  • B. Check the most recent entries in SAPup.log
  • C. Check the system log (transaction SM21) of the SAP system
  • D. Check the messages shown by the SUM UI

Answer: B,D


NEW QUESTION # 44
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.

  • A. Kernel for target release, Linux, SAP HANA
  • B. Kernel for target release, Windows, SAP HANA
  • C. Kernel for target release, Windows, SAP MaxDB
  • D. Kernel for source release, Windows, SAP MaxDB

Answer: B,D


NEW QUESTION # 45
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.

  • A. Post-downtime
  • B. During uptime
  • C. During SPDD
  • D. During downtime

Answer: A,B


NEW QUESTION # 46
Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?

  • A. Shadow on target creation
  • B. Downtime conversion
  • C. Downtime migration
  • D. Silent data migration (SDM)

Answer: C


NEW QUESTION # 47
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center, you can see 40 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?

  • A. These are 40 pairs of Reload processes, so there are 80 R3load processes running.
  • B. Without table contents comparison, only 40 R3load processes are being started.
  • C. SUM is still running in uptime; the 40 defined Reload processes are considered.
  • D. There are 40 Reload processes used for copying and 40 Reload processes for table count verification.

Answer: B


NEW QUESTION # 48
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.

  • A. Depending on the SAP S/4HANA version, there are different SI check frameworks.
  • B. The SI checks are executed in the development system and the results are transported into the subsequent systems.
  • C. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
  • D. You need to build up a SI check framework by applying SAP notes.

Answer: A,D


NEW QUESTION # 49
You are performing an SAP S/4HANA conversion with DMO as an inplace migration. How does SUM transfer the data by default from the source database to the target database during the migration?

  • A. Using R3load and memory pipes
  • B. Using work processes and network socket connection
  • C. Using R3load and file transfer
  • D. Using R3load and network socket connection

Answer: A


NEW QUESTION # 50
......

Pass SAP E_S4HCON2023 Exam in First Attempt Easily: https://www.prepawayexam.com/SAP/braindumps.E_S4HCON2023.ete.file.html

Practice Test Questions Verified Answers As Experienced in the Actual Test!: https://drive.google.com/open?id=19dE6tthW8lR4i2onLBj1gf9IwzeCJxac